Taylor Kohrs collaborated with SEH and the City of Longmont for Longmont Fire District. The work for Fire Station No. 2 included the demolition of existing buildings on 17th Avenue and the construction of a new, pre-engineered metal building (PEMB) with insulated prefinished metal panels to house firefighters and their equipment on a 2.4-acre site. The building contains five pull-through apparatus bays, six bunk rooms, a kitchen, living area, and an equipment room.